Hollister Pharmaceutical
Client: Sisk
Project: Hollister Pharmaceutical, Mayo
Project Size: 520 tonne
Description: This project, which was complete in July 2011, consisted of a large manufacturing facility and office space. The main roof of the warehouse was composed of 20 meter trusses while the office block was constructed from heavy beam and column. Services provided ranged from in-depth design and detailing, through high quality fabrication to on time delivery and safe erection.